Skip to content
English
  • There are no suggestions because the search field is empty.

Creating a New Solar PV & Battery Job in Bridge Select

Watch the video or follow this guide to set up a new solar PV and battery installation job for Small-scale Technology Certificates (STCs) in Bridge Select. 

Step 1: Create Job & Property Details

  1. From the left sidebar, click Jobs and select Create.
  2. Select the relevant technology type (such as STC PV Solar and Battery).
  3. Enter the customer or job name and click Create.
  4. Select the Property Type as either Residential or Commercial.
  5. Scroll down and click Save and Next.

 

Step 2: Configure System Details (Panels & Inverter)

  1. Enter the planned Installation Date.
  2. Click Add Panels and select the approved solar module model and total quantity.
  3. Click Add Inverter to input and attach the inverter specifications.
  4. Add the number of years for the System Warranty.
  5. Confirm equipment details and click Save and Next.

If you're adding a battery to this job, follow the accompanying Adding a Battery & BSTC Compliance in Bridge Select guide.

 

Step 3: Enter Distributor & Assign Installers

  1. Enter the Distributor Job Number and select the corresponding Distributor Type.
  2. Confirm the installation date, which will auto-populate from your previous entry.
  3. Select the System Mounting Type (e.g. building or structure).
  4. Assign the job: select an Installer Company if working with a subcontracting firm, or allocate it directly to the individual Installer.
  5. Enter any Special Instructions required for the installation crew.
  6. Click Save and Next.

 

Step 4: Complete Job Questions & Review Mandatory Evidence

  1. Complete the installation questionnaire and add any additional comments relevant to the job.
  2. Ensure the standard compliance confirmations at the end of the section are set to Yes, then click Save and Next.
  3. Review the Mandatory Documentation section to confirm requirements such as the CCEW (Certificate of Compliance for Electrical Work).
  4. Review the list of Mandatory Photos that the on-site technicians will capture via the Bridge Select app.

 

Step 5: Sign Retailer Declaration & Submit

  1. Navigate to the Retailer Declaration section.
  2. Ensure the authorised person reviews the installation summary and provides their digital sign-off.
  3. Perform a final review of all entered details and click Save.

Note: Once the job is assigned, it will sync automatically with the installer's mobile app so they can upload on-site evidence and complete mandatory photos directly from the field.