Adding a Battery & BSTC Compliance in Bridge Select
Watch the video or follow this step-by-step guide to enter battery storage specifications, configure Battery Small-scale Technology Certificates (BSTCs), and review installer presence verification in Bridge Select.
Step 1: Set Grid Connection & Add Battery

- Navigate to the 2. System Details tab.
- Under the Connection & Battery Details (if applicable) section, select your Connection Type of Electricity Grid (e.g. Connected to an electricity grid).
- Click the blue + Add Battery button to open the equipment entry fields.
Step 2: Configure Battery Specifications & Modules

- Select the Battery manufacturer from the dropdown list (e.g. Sungrow Power Supply Co Ltd).
- Choose the specific Battery model and Battery series.
- Enter the Number of batteries and Number of modules.
Important: The number of modules and the number of batteries must match (for example, if there are four modules, enter four batteries).
- Click + Add to attach the battery unit to the job record.
Step 3: Set Installation Location & Enable BSTC


- Under Location where battery will be or is installed?, select either Indoor or Outdoor.
- Tick the BSTC checkbox to activate battery certificates on the job.
- Complete the required battery questionnaire:
- Confirm if there is a room behind the mounting wall.
- Confirm whether the system is configured to provide backup power.
- Enter the Financial payment amount (the out-of-pocket cost paid by the customer, which must reconcile with the invoice).
- Answer the compliance questions regarding default manufacturer settings, Virtual Power Plant (VPP) capability, and retailer involvement.
- Confirm whether the battery is connecting to a new inverter and check the system warranty duration.
Step 4: Verify Installer Presence Selfies

- Navigate to the 3. Install Details tab.
- Review the Installer Presence panel to monitor the verification photos uploaded by the technician via the mobile app.
Note: there are six required on-site selfies are captured across the job milestones:
Solar PV Selfies: Start, Middle, and End
Battery Selfies: Start, Middle, and End
Step 5: Save and Exit

- Once all details, documentation, and declarations are complete, click Check Information & Save to validate the submission.
- If you need to pause and return to the job later, click Partial Save & Exit at the bottom of the screen to retain your entered data.
Note: Installers must capture presence selfies at the required intervals in real-time through the mobile app, as the Clean Energy Regulator (CER) requires timestamped evidence for battery certificate approvals.