Do you require a solar PV system to be installed in order to be eligible?
BESS1 requires a behind-the-meter solar PV system to be installed at the same NMI as the battery system.
BESS3, BESS4 and BESS5 do not require a solar PV system to be installed, however, incentives may be higher where a battery is installed within 90 days of a new solar PV system being installed.