Is sub-metering required on all M&V projects?
Each Measurement & Verification (M&V) project is evaluated individually to determine the necessity of sub-metering.
In some cases, a project may be sub-metered for a period of time before and after installation to create certificates.
In other cases, the site’s total consumption is measured for a period of time before and after installation to create certificates.
Ecovantage will assess the length of time that existing data is available pre-upgrade and the length of time that may be measured after the upgrade to determine the best creation method.